CHP Logo

Oceanside, CA

The San Luis Rey Cogeneration Facility in Oceanside, CA was developed and commissioned by CHP Clean Energy in 2009. Since beginning operations, the system has delivered an average availability of 98.5% with annual energy savings to the City of Oceanside in excess of $250,000.

  • Cost to City: $0.00
  • Output: 560-700 kW
  • Produces 33% of Plant Electric Usage
  • Satisfies 100% of Anaerobic Digester Heating Needs
  • Time to Construct: 4 months
  • 10 Year PPA Contract with 10 year Renewal Option
  • Guaranteed System Output Ensures Savings to City of Oceanside
  • Projected Annual Savings: $250,000 – $350,000

Print Friendly and PDF

CHP Installed Projects Oceanside